Jump to content

Extra Long Leads


Jetty
 Share

Recommended Posts

We are taking Jet camping with us in a weeks time which I am super excited about. He has to be either crated or on lead at all times though. I have tried previously to buy on of those long line leads or 'recall' leads which are a few metres long but can never find one longer then 120cm or something. Does anyone know where I could find one of these on short notice. I would prefer not online unless ofcourse I could get express postage.

ETA: I am South of Brisbane, Logan Area.

Edited by ♥JJ
Link to comment
Share on other sites

You can also get 180cm long leads at most Kmart or BigW pet sections if you want something longer than the normal lead (which is usually 90-120cm long) but not the 8+ metres of a lunge lead. If the breed is very small I have seen really long small dog leads in the $2.00, Crazy Clarkes and Red Dot style stores can't remember the length but at least 5metres I'd say.

Link to comment
Share on other sites

I am after something about 5 metres and has to be strong if he pulls which is most likely. Thanks huga for the offer. Someone has PM'd me so I will see what they can make otherwise I will come to you :confused:

Link to comment
Share on other sites

I actually found a great 7m lead at a $2 dollar shop of all places. Its aqmazing what you find in those shops. Its that standard fabric type lead material and has normal clip at one end and normal loop 'handle' at the other. :rofl: Its brilliant and has come in handy many times.

Link to comment
Share on other sites

Thanks Everyone. Everywhere I seemed to search both in store and online didn't have any long enough.

How long do you want?

33ft/10m lines:

http://www.k9pro.com.au/products/Premium-L...ng-line%29.html

http://www.k9pro.com.au/products/Standard-...ng-Line%29.html

11m line:

http://www.vetnpetdirect.com.au/BDTRKL

15ft/5m lines:

http://www.k9pro.com.au/products/Premium-L...-x-16mm%29.html

http://www.k9pro.com.au/products/Standard-...-x-25mm%29.html

http://www.vetnpetdirect.com.au/BDLL

(Both these places express post so you can have it by the following day)

Otherwise Black Dog can custom make one to any size you like: http://www.blackdog.net.au/index.php

Link to comment
Share on other sites

I have for my lot when we go camping a screw in hook and a tie down line from chicken feed about $10 from memory the Rotti cant pull it fromt he ground

Will see if I can find a pic

Edit gelert-dog-tether-tent-anchor.jpg

Try this for tying up or a long lead

Dog tie out

Edited by Pandii
Link to comment
Share on other sites

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share

×
×
  • Create New...